Service 05 of 06
Concrete Frames & Slabs
Ground-bearing and suspended slabs, podium decks and full reinforced concrete frames, taken from formwork through to a finished pour.
What's included
Formwork, reinforcement and pour, as one package
This is where the other trades come together: formwork built and braced, reinforcement fixed and checked, and the pour placed and compacted properly. Because formwork and reinforcement are run in-house, a frame or slab package is delivered by a single, coordinated team rather than passed between separate subcontractors.
- Ground-bearing slabs
- Suspended slabs
- Podium decks
- Reinforced concrete frames
- Columns and upstands
- Finished ready for the next trade



How it runs
From falsework to finished frame
01
Formwork & falsework
Shuttering and temporary support built to the design.
02
Reinforcement fixed & checked
Rebar placed and checked against the drawings before covering.
03
Pour & compact
Concrete placed and vibrated to remove air pockets.
04
Cure & strike
Left to cure, then formwork struck once it can hold its own weight.
Get in touch
Request a Quotation
Contact us with your drawings and programme. We respond promptly to every enquiry.
07872 015713