Service 01 of 06
Groundworks & Muckaway
Site strip, reduced dig and muckaway, run by the same crew who will pour your footings, keeping the programme moving without dependency on external plant.
What's included
Ground cleared, dig done, site ready
Before anything gets poured, the ground has to be stripped, dug and cleared, and the spoil has to go somewhere. We run that end of the job ourselves, with our own operators, so it happens on your programme rather than whenever hired plant is free.
- Site strip and clearance
- Reduced dig and bulk excavation
- Muckaway and spoil removal
- Drainage runs and ducting
- Access routes and hardstanding
- Ground left ready for footings



How it runs
From site visit to ready-for-footings
01
Site visit & access check
We walk the site, check access for plant and confirm what's being dug.
02
Strip & reduced dig
Topsoil stripped and the site dug down to formation level.
03
Muckaway & spoil removal
Spoil loaded out and removed, keeping the site clear to work.
04
Ready for footings
Ground left level and ready to hand straight to the footings crew, us or yours.
Get in touch
Request a Quotation
Contact us with your drawings and programme. We respond promptly to every enquiry.
07872 015713