Service 02 of 06
Formwork & Shuttering
Panel formwork for footings, walls, columns and slabs, braced true and struck on programme, so the next trade is never waiting on us.
What's included
Set true, braced right, struck clean
Formwork is the mould the concrete takes its shape from, so it has to be plumb, square and properly braced before anyone thinks about pouring. We set it, check it, and strike it once the concrete's ready, working from your engineer's formwork drawings rather than guesswork.
- Panel formwork for footings and walls
- Column and upstand shuttering
- Prop bracing and alignment checks
- Correct release agent and finish
- Striking on programme, not late
- Built to your engineer's drawings



How it runs
From set-out to strike
01
Set out & check levels
Lines and levels marked before a single panel goes up.
02
Erect panels & bracing
Formwork built and propped to the drawing.
03
Check plumb, line & square
Every face checked before the pour goes ahead.
04
Pour, cure & strike
Formwork struck once the concrete has cured enough to hold its own shape.