Service 04 of 06
Footings & Foundations
Trench fill, strip and pad footings, poured true and level, first time. Get this wrong and everything built on top of it inherits the problem.
What's included
The foundation everything else stands on
Footings only get one chance to be right. We excavate to depth, reinforce and shutter to specification, and pour true and level, with the damp proof membrane laid correctly before anything gets covered over. Groundworks and reinforcement are ours too, so nothing about the footing package is subcontracted three times over.
- Trench fill footings
- Strip and pad footings
- Raft foundations
- Damp proof membrane laid correctly
- Poured true and level
- Left ready for building control sign-off



How it runs
From excavation to hand-over
01
Excavate to depth
Dug to the depth and width your engineer has specified.
02
Reinforce & shutter
Rebar fixed and formwork set where the design calls for it.
03
Pour & level
Concrete poured and finished true and level.
04
Cure & hand over
Left to cure and handed over ready for the next stage.
Get in touch
Request a Quotation
Contact us with your drawings and programme. We respond promptly to every enquiry.
07872 015713