Footings & Foundations

Trench fill, strip and pad footings, poured true and level, first time. Get this wrong and everything built on top of it inherits the problem.

What's included

The foundation everything else stands on

Footings only get one chance to be right. We excavate to depth, reinforce and shutter to specification, and pour true and level, with the damp proof membrane laid correctly before anything gets covered over. Groundworks and reinforcement are ours too, so nothing about the footing package is subcontracted three times over.

  • Trench fill footings
  • Strip and pad footings
  • Raft foundations
  • Damp proof membrane laid correctly
  • Poured true and level
  • Left ready for building control sign-off
Long reinforced trench footing across a rural site
Trench footing, reinforced and shuttered
Reinforcement mat laid in a footing trench
Reinforcement mat, footing trench
Fenced and signed excavation with formwork below ground
Excavation, signed and secured
Timber-formed footing lines ready for reinforcement
Footing lines, set out and formed

How it runs

From excavation to hand-over

01

Excavate to depth

Dug to the depth and width your engineer has specified.

02

Reinforce & shutter

Rebar fixed and formwork set where the design calls for it.

03

Pour & level

Concrete poured and finished true and level.

04

Cure & hand over

Left to cure and handed over ready for the next stage.

Get in touch

Request a Quotation

Contact us with your drawings and programme. We respond promptly to every enquiry.

07872 015713

Submit an Enquiry

LocationBarrington, Cambridgeshire, CB22
Call 07872 015713