Concrete Frames & Slabs Contractor in Cambridgeshire & Norfolk

Ground-bearing and suspended slabs, podium decks and full reinforced concrete frames, taken from formwork through to a finished pour.

What's included

Formwork, reinforcement and pour, as one package

This is where the other trades come together: formwork built and braced, reinforcement fixed and checked, and the pour placed and compacted properly. Because we do the formwork and reinforcement ourselves, one crew delivers the whole frame or slab, not a string of subcontractors who've never worked together.

  • Ground-bearing slabs
  • Suspended slabs
  • Podium decks
  • Reinforced concrete frames
  • Columns and upstands
  • Finished ready for the next trade
Finished power-floated concrete slab
Finished slab, power-floated
Concrete pump truck placing a slab inside a steel-frame building
Slab pour, steel-frame building
Freshly poured concrete slab being finished
Slab, freshly poured
Reinforced concrete frame with formwork and edge protection
Reinforced concrete frame

Slab types

Ground-bearing, suspended or post-tensioned

Which slab you need comes down to what's underneath it and what it has to carry. We pour all three, working from your engineer's design.

Ground-bearing slabs

Poured straight onto a prepared, compacted sub-base, carrying its load directly into the ground below. The standard slab for warehouses, industrial units and most ground floors.

Suspended slabs

Spanning between beams, columns or walls with nothing solid underneath, so the reinforcement is doing the work a ground-bearing slab hands to the earth. Used for upper floors, podium decks and basements.

Post-tensioned slabs

Steel tendons stressed after the pour to compress the concrete, cutting cracking and letting the slab run thinner and span further. Common on podium decks and larger commercial floors.

Columns & upstands

The vertical elements a frame hangs off, formed and poured to the same tolerances as the slab itself. Built alongside the formwork and reinforcement packages.

How it runs

From falsework to finished frame

01

Formwork & falsework

Shuttering and temporary support built to the design.

02

Reinforcement fixed & checked

Rebar placed and checked against the drawings before covering.

03

Pour & compact

Concrete placed and vibrated to remove air pockets.

04

Cure & strike

Left to cure, then formwork struck once it can hold its own weight.

Get in touch

Request a Quotation

Send us your drawings and we'll get back to you quickly.

07872 015713

Submit an Enquiry

CoverageWe cover Cambridgeshire, Norfolk, Suffolk, Essex, Hertfordshire & Bedfordshire
Call 07872 015713