Reinforcement & Rebar Fixing Contractor in Cambridgeshire & Norfolk

Rebar cut, bent and fixed to your engineer's drawings and bar schedule, tied and spaced correctly, and left ready for inspection before a single mixer arrives.

What's included

Bar schedules followed to the mark

Reinforcement is what actually carries the load once the concrete cures, so it has to match the specification exactly: the right bar size, the right spacing, the right cover. We work straight from your bar schedules and drawings, and we leave every cage ready for building control to check before it gets covered up.

  • Cutting and bending to bar schedule
  • Rebar cage fabrication
  • Fixing to engineer's drawings
  • Mesh laying, including A393 and A252
  • Correct cover with spacers and chairs
  • Tied and left ready for inspection
Overhead view of a tied reinforcement cage
Reinforcement cage, overhead
Reinforcement mesh laid ready for a slab
Mesh laid for a slab
Vertical reinforcement bars for a retaining wall
Wall reinforcement, fixed and spaced
Reinforcement starter bars ready for the next pour
Starter bars, ready for the next lift

The detail that matters

Why the small dimensions carry the biggest risk

Reinforcement fails quietly, from small errors compounding, not obvious mistakes. This is what we're checking on every cage before it's covered up.

Bar bending schedule

The BS 8666 shape codes and cutting lengths that tell us exactly how each bar is cut and bent, so what arrives on site matches what the engineer designed, first time.

Starter bars & lapping

Bars cast into an earlier pour so the next lift ties structurally into it. The overlap, or lap length, has to be long enough to transfer the load between the two bars: too short and the joint is weaker than the bar either side of it.

Cover

The gap between the steel and the concrete face. Too little and the reinforcement corrodes early; too much and it doesn't do its job. Held in place with spacers and chairs, checked before every pour.

Where it goes next

The same cages and mesh go into footings, frames and slabs, and below-ground structures like chambers and headwalls on our civils work.

How it runs

From drawing to inspection-ready

01

Read drawings & bar schedule

Every bar size, spacing and lap length taken from your specification.

02

Cut, bend & fabricate

Cages built to shape, ready to lift and place.

03

Fix, tie & space

Bars tied off and held at the correct cover with spacers and chairs.

04

Ready for inspection & pour

Left clean and accessible for building control before the pour.

Get in touch

Request a Quotation

Send us your drawings and we'll get back to you quickly.

07872 015713

Submit an Enquiry

CoverageWe cover Cambridgeshire, Norfolk, Suffolk, Essex, Hertfordshire & Bedfordshire
Call 07872 015713